Kuwait’s Fifth Ring Road Opens New Bridge
Kuwait’s Fifth Ring Road Opens New Bridge
Kuwait announced the opening of a new bridge on the Fifth Ring Road, opposite Al-Andalus area in both directions (Salmiya and Kairouan).
The total length of the bridge is 3 km and it is with 10 lanes. The administration added that this comes within the project of developing the ring road.

About Kuwait’s Fifth Ring Road
Begins from the gulf road in Salmiya and ends at Jahra. It is the longest ring road.